Case Study: Keurig Dr Pepper

PULSE Integration and Keurig Dr Pepper: Partnering for Long-Term Success

The Challenge

Keurig Dr Pepper Spartanburg

When faced with the challenge of controlling costs associated with filling tens of thousands of orders per day, Keurig Dr Pepper turned to PULSE to implement changes at three separate manufacturing facilities throughout North America.

PULSE Integration provided a comprehensive solution that improved costs and decreased the labor force by lowering the cost per pod manufactured and utilizing Industry 4.0 Thinking.

The Solution

PULSE Integration devised an innovative solution implementing warehouse execution software, track and trace capabilities, automated material handling, decoupling, automated RM handling, automated trash handling, and centralized palletizing to improve their costs, while decreasing their labor force.

Each warehouse required a custom solution, ranging from installing hundreds of connected devices at new facilities to retrofitting existing operations.